WIRING OF PARAMETERS

I returned to my infrastructure model this week, adding more detail as the proposal develops. The piers have been added which provide the structure for the form to evolve, with a 'wired' framework linking each of the piers. Initial design moves have been added, with pontoons represented by mesh at water level and a ramped landscape weaving its way between the piers.
Get the flash player here: http://www.adobe.com/flashplayer

No comments:

Post a Comment